Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/formosam/public_html/phpBB3/includes/bbcode.php on line 112

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/formosam/public_html/phpBB3/includes/bbcode.php on line 112
FormosaMBA 傷心咖啡店 • 查看主题 - [問題]GWD19-34

[問題]GWD19-34

關於 Problem Solving 和 Data Sufficiency 的問題都可以在這邊發表

版主: shpassion, Traver0818

[問題]GWD19-34

帖子magic » 2006-10-22 02:28

Q34:
Of the 2,500 tons of ore mined daily at a quarry, 0.4 percent results in a certain pure metal. In how many days of mining will the total amount of pure metal produced at the quarry be equal to the daily amount of ore mined?

A. 10
B. 100
C. 250
D. 400
E. 1,000

答案是C
請問怎麼算阿??
magic
中級會員
中級會員
 
帖子: 93
注册: 2006-04-30 23:46

帖子Pao » 2006-10-23 13:39

ㄧ天產0.4% pure material, 計ㄧ天產 0.4%X2500頓 pure material, 要挖幾天所產的pure material 才會等於一天挖礦的數量(2500噸),計 2500/(0.4%X2500)=250天
Pao
初級會員
初級會員
 
帖子: 30
注册: 2006-05-19 10:39
地址: Taipei

帖子magic » 2006-10-28 00:16

謝謝唷
magic
中級會員
中級會員
 
帖子: 93
注册: 2006-04-30 23:46


回到 GMAT MATH 考區

在线用户

正在浏览此版面的用户:没有注册用户 和 7 位游客

cron