Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/formosam/public_html/phpBB3/includes/bbcode.php on line 112

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/formosam/public_html/phpBB3/includes/bbcode.php on line 112
FormosaMBA 傷心咖啡店 • 查看主题 - [問題]天山6-26

[問題]天山6-26

關於 Problem Solving 和 Data Sufficiency 的問題都可以在這邊發表

版主: shpassion, Traver0818

[問題]天山6-26

帖子Albert5 » 2005-07-07 09:31

Running at their respective constant rates, machine X takes 2 days longer to produce W widgets than machine Y. At these rate, if the two machines together produce 5/4 W widgets in 3 days, how many days would it take machine X alone to produce 2W widgets?

A.4
B.6
C.8
D.10
E.12

ANS.E
Albert5
新手會員
新手會員
 
帖子: 16
注册: 2005-03-29 14:52

帖子micht » 2005-07-07 09:42

图片图片图片
头像
micht
白金會員
白金會員
 
帖子: 3276
注册: 2004-09-27 12:13


回到 GMAT MATH 考區

在线用户

正在浏览此版面的用户:没有注册用户 和 6 位游客