Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/formosam/public_html/phpBB3/includes/bbcode.php on line 112

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/formosam/public_html/phpBB3/includes/bbcode.php on line 112
FormosaMBA 傷心咖啡店 • 檢視主題 - GWD1-Q28

GWD1-Q28

關於 Problem Solving 和 Data Sufficiency 的問題都可以在這邊發表

版主: shpassion, Traver0818

GWD1-Q28

文章Karen » 2004-08-30 19:40

Q28:
Three printing presses, R, S, and T, working together at their respective constant rates, can do a certain printing job in 4 hours. S and T, working together at their respective constant rates, can do the same job in 5 hours. How many hours would it take R, working alone at its constant rate, to do the same job?

A. 8
B. 10
C. 12
D. 15
E. 20


ANS: E

THanks!
Karen
初級會員
初級會員
 
文章: 21
註冊時間: 2004-08-25 10:52

文章huacy » 2004-08-30 20:30

1. 4R+4S+4T=Const.
2. 5S+5T=Const.
-------------------------
R=1/4(S+T)
地球太危險了,大家快回火星吧......
頭像
huacy
高級會員
高級會員
 
文章: 570
註冊時間: 2004-07-29 17:49
來自: 火星

文章Quinton » 2004-12-01 17:53

1/X + 1/5 = 1/4
-->X=20

這題是OG上的基本題唷!(工時題P.65)
『當妳真心渴望某樣東西時,整個宇宙都會聯合起來幫助你完成』---牧羊少年奇遇記---
頭像
Quinton
黃金會員
黃金會員
 
文章: 869
註冊時間: 2004-10-30 10:08


回到 GMAT MATH 考區

誰在線上

正在瀏覽這個版面的使用者:沒有註冊會員 和 3 位訪客