Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/formosam/public_html/phpBB3/includes/bbcode.php on line 112

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/formosam/public_html/phpBB3/includes/bbcode.php on line 112

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/formosam/public_html/phpBB3/includes/bbcode.php on line 112
FormosaMBA 傷心咖啡店 • 查看主题 - PP-T1-PS40

PP-T1-PS40

關於 Problem Solving 和 Data Sufficiency 的問題都可以在這邊發表

版主: shpassion, Traver0818

PP-T1-PS40

帖子Huang Hsin-Yi » 2008-02-13 23:50

40. 5629-!-item-!-187;#058&004684
Six machines, each working at the same constant rate, together can complete a certain job in 12 days. How many additional machines, each working at the same constant rate, will be needed to complete the job in 8 days?

(A) 2
(B) 3
(C) 4
(D) 6
(E) 8


Ans:B
Huang Hsin-Yi
黃金會員
黃金會員
 
帖子: 1038
注册: 2007-08-17 00:41
地址: Tainan

帖子amyliang » 2008-02-14 03:26

速率 * 時間 = 工作量
M * 12 = 1 所以六台機器的速率為1/12 一台就是1/72
(1/72)X * 8 = 1
X = 9 需要九台機器 所以比原本多三台
年輕的時侯真該多讀點書......
amyliang
中級會員
中級會員
 
帖子: 146
注册: 2006-01-13 20:13

帖子Huang Hsin-Yi » 2008-02-14 09:01

謝謝囉
Huang Hsin-Yi
黃金會員
黃金會員
 
帖子: 1038
注册: 2007-08-17 00:41
地址: Tainan


回到 GMAT MATH 考區

在线用户

正在浏览此版面的用户:没有注册用户 和 10 位游客