Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/formosam/public_html/phpBB3/includes/bbcode.php on line 112

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/formosam/public_html/phpBB3/includes/bbcode.php on line 112
FormosaMBA 傷心咖啡店 • 檢視主題 - [問題]GWD19-34

[問題]GWD19-34

關於 Problem Solving 和 Data Sufficiency 的問題都可以在這邊發表

版主: shpassion, Traver0818

[問題]GWD19-34

文章magic » 2006-10-22 02:28

Q34:
Of the 2,500 tons of ore mined daily at a quarry, 0.4 percent results in a certain pure metal. In how many days of mining will the total amount of pure metal produced at the quarry be equal to the daily amount of ore mined?

A. 10
B. 100
C. 250
D. 400
E. 1,000

答案是C
請問怎麼算阿??
magic
中級會員
中級會員
 
文章: 93
註冊時間: 2006-04-30 23:46

文章Pao » 2006-10-23 13:39

ㄧ天產0.4% pure material, 計ㄧ天產 0.4%X2500頓 pure material, 要挖幾天所產的pure material 才會等於一天挖礦的數量(2500噸),計 2500/(0.4%X2500)=250天
Pao
初級會員
初級會員
 
文章: 30
註冊時間: 2006-05-19 10:39
來自: Taipei

文章magic » 2006-10-28 00:16

謝謝唷
magic
中級會員
中級會員
 
文章: 93
註冊時間: 2006-04-30 23:46


回到 GMAT MATH 考區

誰在線上

正在瀏覽這個版面的使用者:沒有註冊會員 和 7 位訪客